Equipment
Processes at the San Miguel Plant are automated and efficient in almost 100% of the cement and lime manufacturing phases.
The San Gabriel plant design is adapted to the area’s landscape in such a way that the installed conveyor belt preserves the forest underneath the structure and moves 2,100 tons of raw material per hour.